VANCOUVER, BC, May 14, 2023 /CNW/ - Rock Tech Lithium Inc. (TSXV:RCK.VN) (OTCQX:RCKTF) (FWB:RJIB) (WKN:A1XF0V) (the "Company" or "Rock Tech") is pleased to announce that it has reached a significant milestone in the preparation of construction of its lithium hydroxide converter and refinery plant in Guben, Germany, with the completion of the Front-End Loading stage 3 study ("FEL3"). The study includes detailed specifications for construction, commissioning, start-up, and operation, along with a purchase-ready major equipment cost estimates. The study was finalized by the Company's German subsidiary Rock Tech Guben GmbH in collaboration with engineering partner AFRY AB, paving the final way for the Project's construction phase. The profitability has been estimated to have a post-tax NPV (8%) of EUR 1,194m (USD 1,246m) - an increase of 43 per cent compared to the previous Bankable Project Study2. Additionally, Rock Tech has appointed Deutsche Bank AG as placement agent for the Company's Converter-related financing.
Read more at newswire.caRock Tech Lithium Completes Final Engineering Study Before Construction of its Guben Lithium Converter and Mandates Deutsche Bank as Placement Agent
Newswire.ca -
Mon May 15, 2023
Columnist
Contributor Content
Press Release
Sponsored Content
All information and data in this article is solely for informational purposes. For more information please view the Barchart Disclosure Policy here
This article could contain syndicated content. We have not reviewed, approved, or endorsed the content and may receive compensation for placement of the content on this site. For more information please view the Barchart Disclosure Policy here
All information and data in this article is solely for informational purposes. For more information please view the Barchart Disclosure Policy here